Manufacturing complex

Manufacturing complex
Manufacturing part of the complex occupies more than 1600 sq.m. and consists of serveral functional zones

- 2 assembly shop floors 
- Busbar processing zones
- Locksmith zone
- Testing zone
- Spare parts and tools zone
- Packaging zone
- Finished products zone
- Loading zone
- Demo equipment zone
- Training room

Panel building zone is divided into 12 assembly lines. 6 assembly teams are involved in the process.

 

 

Training room

Specially equipped room with multimedia devices to conduct training presentations, sessions and seminars.

Demoequipmentzone

Samples of assembled switchboards are displayed in the zone. Customers and partners can  learn more about features and options of the produced equipment.

  • Busbar processing is one of the most important processes in panel building
  • Warehouse is located in a separate building with more than 1000 sq.m. of...